A contract was awarded to Invictacut on the North Kent coast which involved the floor sawing of a concrete promenade slab to enable a section of slab and sea wall coping to be removed without disturbing the remaining structure.
Following reinstatement of the promenade slab and copings, all joints were pointed with Sikaflex Pro3 sealant.