Severing of R.C Sections – Dover Western Docks

A reinforced concrete plinth, which was sitting on a slab adjacent to the dock wall required removal.  Due to the proximity of the dock wall, the plinth could not be…

Comments Off on Severing of R.C Sections – Dover Western Docks

Drilling of Test Cores – Marble Arch

Two areas of cracking in a marble wall required investigation as to the make up of the wall.  Using a Hilti suction rig, to prevent bolting onto the marble surface,…

Comments Off on Drilling of Test Cores – Marble Arch

Removal of RC Plinths – Woking

The versatility of the Brokk machine was perfectly illustrated on this job. An opening through a 1B wall needed to be saw cut and broken out with the Brokk machine…

Comments Off on Removal of RC Plinths – Woking