Grouting – West Kingsdown, Kent
Four steel plates were positioned and levelled in a rebated floor slab in the loading bay of a heavy engineering factory. The <25mm void between the steel plate and the…
Four steel plates were positioned and levelled in a rebated floor slab in the loading bay of a heavy engineering factory. The <25mm void between the steel plate and the…
The edge of a ground bearing slab in a gas supply depot required removing to facilitate the installation of pipework. Given the sensitivity if the working environment and the lack…
Track sawing to form a lift and staircase opening through a 580mm thick r/c waffle floor slab. The centres being removed by drilling, bursting and breaking. All works were carried…
Invictacut were contracted to cut and break out a 20.00m long x 0.78m wide x 0.10m deep channel to enable power supplies to be run from the front of the…
A contract was awarded to Invictacut on the North Kent coast which involved the floor sawing of a concrete promenade slab to enable a section of slab and sea wall…