Invictacut were contracted to cut and break out a 20.00m long x 0.78m wide x 0.10m deep channel to enable power supplies to be run from the front of the church to two new floor boxes at the rear. The breaking exercise was made easier by the formation of a series of demolition cuts within the width of the chase.