Four steel plates were positioned and levelled in a rebated floor slab in the loading bay of a heavy engineering factory. The <25mm void between the steel plate and the concrete slab below required filling with a grout that could withstand the heavy loadings. Weber Five Star Grout SP was chosen for its high strength and good flow properties to ensure complete filling of the void.


