A reinforced concrete plinth, which was sitting on a slab adjacent to the dock wall required removal. Due to the proximity of the dock wall, the plinth could not be broken, so track sawing the slab into sections for lifting away was the favoured option. Approx 43m of cut at 600mm deep.